| January 27, 2022 | Standard (routine) inspection | Provide appropriate treatment and care according to orders, resident’s preferences and goals. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of February 27, 2022. |
| November 9, 2023 | Standard (routine) inspection | Ensure drugs and biologicals used in the facility are labeled in accordance with currently accepted professional principles; and all drugs and biologicals must be stored in locked compartments, separately locked, compartments for controlled drugs. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of December 6, 2023. |
| November 9, 2023 | Complaint inspection | Procure food from sources approved or considered satisfactory and store, prepare, distribute and serve food in accordance with professional standards. | Potential for more than minimal harm, widespread (F) | The home has a recorded correction date of December 7, 2023. |
| April 28, 2025 | Complaint inspection | Procure food from sources approved or considered satisfactory and store, prepare, distribute and serve food in accordance with professional standards. | Potential for more than minimal harm, widespread (F) | The home has a recorded correction date of May 28, 2025. |
| February 26, 2026 | Standard (routine) inspection | Honor the resident's right to a dignified existence, self-determination, communication, and to exercise his or her rights. | Potential for more than minimal harm, pattern (E) | The home has a recorded correction date of March 22, 2026. |
| February 26, 2026 | Standard (routine) inspection | Ensure residents do not lose the ability to perform activities of daily living unless there is a medical reason. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of March 22, 2026. |
| February 26, 2026 | Standard (routine) inspection | Provide safe, appropriate dialysis care/services for a resident who requires such services. | Potential for more than minimal harm, pattern (E) | The home has a recorded correction date of March 22, 2026. |
| February 26, 2026 | Standard (routine) inspection | Inform resident or representatives choice to enter into binding arbitration agreement and right to refuse. | Potential for more than minimal harm, widespread (F) | The home has a recorded correction date of March 26, 2026. |
| February 26, 2026 | Standard (routine) inspection | Provide a neutral and fair arbitration process and agree to arbitrator and venue. | Potential for more than minimal harm, widespread (F) | The home has a recorded correction date of March 26, 2026. |