| February 21, 2024 | Standard (routine) inspection | Allow residents to self-administer drugs if determined clinically appropriate. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of February 22, 2024. |
| February 21, 2024 | Standard (routine) inspection | Develop and implement a complete care plan that meets all the resident's needs, with timetables and actions that can be measured. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of February 27, 2024. |
| February 21, 2024 | Standard (routine) inspection | Ensure that a nursing home area is free from accident hazards and provides adequate supervision to prevent accidents. | Potential for more than minimal harm, pattern (E) | The home has a recorded correction date of February 22, 2024. |
| February 21, 2024 | Standard (routine) inspection | Ensure that feeding tubes are not used unless there is a medical reason and the resident agrees; and provide appropriate care for a resident with a feeding tube. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of May 1, 2024. |
| February 21, 2024 | Standard (routine) inspection | Provide or obtain laboratory tests/services when ordered and promptly tell the ordering practitioner of the results. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of February 22, 2024. |
| February 21, 2024 | Standard (routine) inspection | Procure food from sources approved or considered satisfactory and store, prepare, distribute and serve food in accordance with professional standards. | Potential for more than minimal harm, pattern (E) | The home has a recorded correction date of February 22, 2024. |
| February 21, 2024 | Standard (routine) inspection | Provide and implement an infection prevention and control program. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of February 22, 2024. |
| February 25, 2025 | Standard (routine) inspection | Honor the resident's right to a safe, clean, comfortable and homelike environment, including but not limited to receiving treatment and supports for daily living safely. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of March 17, 2025. |
| February 25, 2025 | Standard (routine) inspection | Ensure services provided by the nursing facility meet professional standards of quality. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of March 21, 2025. |
| February 25, 2025 | Standard (routine) inspection | Ensure drugs and biologicals used in the facility are labeled in accordance with currently accepted professional principles; and all drugs and biologicals must be stored in locked compartments, separately locked, compartments for controlled drugs. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of March 21, 2025. |
| February 25, 2025 | Standard (routine) inspection | Procure food from sources approved or considered satisfactory and store, prepare, distribute and serve food in accordance with professional standards. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of March 21, 2025. |
| March 24, 2026 | Standard (routine) inspection | Provide timely, quality laboratory services/tests to meet the needs of residents. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of April 9, 2026. |
| March 24, 2026 | Standard (routine) inspection | Procure food from sources approved or considered satisfactory and store, prepare, distribute and serve food in accordance with professional standards. | Potential for more than minimal harm, pattern (E) | The home has a recorded correction date of April 9, 2026. |
| March 24, 2026 | Standard (routine) inspection | Provide and implement an infection prevention and control program. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of April 9, 2026. |