| June 29, 2023 | Standard (routine) inspection | Ensure each resident receives an accurate assessment. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of August 22, 2023. |
| June 29, 2023 | Standard (routine) inspection | Ensure drugs and biologicals used in the facility are labeled in accordance with currently accepted professional principles; and all drugs and biologicals must be stored in locked compartments, separately locked, compartments for controlled drugs. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of August 22, 2023. |
| October 10, 2024 | Standard (routine) inspection | Ensure each resident receives an accurate assessment. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of November 24, 2024. |
| October 10, 2024 | Standard (routine) inspection | Provide and implement an infection prevention and control program. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of November 24, 2024. |
| September 18, 2025 | Standard (routine) inspection | Honor the resident's right to request, refuse, and/or discontinue treatment, to participate in or refuse to participate in experimental research, and to formulate an advance directive. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of October 30, 2025. |
| September 18, 2025 | Standard (routine) inspection | Provide the required documentation or notification related to the resident's needs, appeal rights, or bed-hold policies. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of October 30, 2025. |
| September 18, 2025 | Standard (routine) inspection | Create and put into place a plan for meeting the resident's most immediate needs within 48 hours of being admitted | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of October 30, 2025. |