| September 6, 2024 | Standard (routine) inspection | Procure food from sources approved or considered satisfactory and store, prepare, distribute and serve food in accordance with professional standards. | Potential for more than minimal harm, pattern (E) | The home has a recorded correction date of October 15, 2024. |
| September 6, 2024 | Standard (routine) inspection | Provide and implement an infection prevention and control program. | Potential for more than minimal harm, pattern (E) | The home has a recorded correction date of September 9, 2024. |
| September 11, 2025 | Standard (routine) inspection | Ensure that residents are fully informed and understand their health status, care and treatments. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of October 19, 2025. |
| September 11, 2025 | Standard (routine) inspection | Ensure drugs and biologicals used in the facility are labeled in accordance with currently accepted professional principles; and all drugs and biologicals must be stored in locked compartments, separately locked, compartments for controlled drugs. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of October 19, 2025. |
| September 11, 2025 | Standard (routine) inspection | Provide and implement an infection prevention and control program. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of October 19, 2025. |
| September 11, 2025 | Standard (routine) inspection | Educate residents and staff on COVID-19 vaccination, offer the COVID-19 vaccine to eligible residents and staff after education, and properly document each resident and staff member's vaccination status. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of October 19, 2025. |
| August 5, 2026 | Standard (routine) inspection | Provide and implement an infection prevention and control program. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of August 31, 2026. |
| September 6, 2024 | Standard (routine) inspection | Ensure each resident receives an accurate assessment. | Potential for minimal harm, pattern (B) | The home has a recorded correction date of October 17, 2024. |