| July 1, 2021 | Standard (routine) inspection | Timely report suspected abuse, neglect, or theft and report the results of the investigation to proper authorities. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of August 25, 2021. |
| July 1, 2021 | Standard (routine) inspection | Respond appropriately to all alleged violations. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of August 25, 2021. |
| July 1, 2021 | Standard (routine) inspection | Develop and implement a complete care plan that meets all the resident's needs, with timetables and actions that can be measured. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of August 25, 2021. |
| July 1, 2021 | Standard (routine) inspection | Develop the complete care plan within 7 days of the comprehensive assessment; and prepared, reviewed, and revised by a team of health professionals. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of August 25, 2021. |
| July 1, 2021 | Standard (routine) inspection | Ensure drugs and biologicals used in the facility are labeled in accordance with currently accepted professional principles; and all drugs and biologicals must be stored in locked compartments, separately locked, compartments for controlled drugs. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of August 25, 2021. |
| July 1, 2021 | Standard (routine) inspection | Dispose of garbage and refuse properly. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of August 25, 2021. |
| September 1, 2023 | Standard (routine) inspection | Develop the complete care plan within 7 days of the comprehensive assessment; and prepared, reviewed, and revised by a team of health professionals. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of October 27, 2023. |
| March 11, 2025 | Standard (routine) inspection | Develop and implement a complete care plan that meets all the resident's needs, with timetables and actions that can be measured. | Potential for more than minimal harm, isolated (D) | The home has a recorded correction date of May 7, 2025. |
| March 11, 2025 | Standard (routine) inspection | Encode each resident’s assessment data and transmit these data to the State within 7 days of assessment. | Potential for minimal harm, pattern (B) | The home has a recorded correction date of May 7, 2025. |